Language
info@ibuildingproducts.co.uk +44 (0)1943 607538

Installation Guide – Ridges – Flexim Roof Putty

Apply Flexim to a dry and dustfree substrate, using the gloves provided

The joints have to filled up completeley with Flexim ; use broken tiles (pieces oftiles) to fill up the space under the ridge-cap

Press ridge-cap firmly down into the centre of the bar, ensuring that the Flexim is both inside and outside of the ridge-cap. Keep the joints as tight as possible

Trowel off all excess Flexim with your putty knife. Smooth out the Flexim until an even finish is achieved

Smooth the surface. Flexim is instantly waterproof and remains flexible.

Copyright © by iBuilding Products - Design & Development by Syvo Home  The Company  Projects  Contact  Sitemap

Scroll to Top